Timeline

There is so much to do in so little time. Planning is key now.

2025 Q4 - Tidy-up time

  • Write a paper on Degrees of Freedom Analysis and mathematical problem formulation.
  • Draft a proposal interface for live data processing
  • Draft a proposal interface for online learning
  • Implement Dynamics support in the Ahuora Platform
  • Implement 1d Unit Operations in the Ahuora Platform
  • Find more methods to approximate solutions when you don't have enough measurements to solve (e.g parmest from design calcs?)

2026 Q1 - Getting real-time

  • Summer Students
  • Work with other students on implementing live data processing and online learning frameworks
  • Update the unit operations system to allow adding more unit operations without as much code changes
  • Industry training day

2026 Q2 - Case Studies round 2

  • Evaluate live data processing and online learning frameworks on case studies
  • Identify the core principles/tenets that we should bake into the live data processing methodology
  • Update implementations based on the evaluations.
  • Write a paper on doing physics grounded ML by augmenting data from a parameter estimated model so it behaves sensibly outside the training region.

2026 Q3 - Mid-PhD Hiatus

  • CMU Visit
  • Nonlinear programming optimization - relaxation for more reliable solves
  • Upgrade the Ahuora unit operations to make solving much more reliable
  • Write a paper somewhat related to this.

2026 Q4 - Disrupt the Industry

  • Proposals for Summer Students - come up with project ideas (additional analysis tools?)
  • Last major implementation push to refactor Ahuora platform and live data processing to work well together and be reliable
  • Start talking to sites about having the ADTP running in real-time on their site.

2027 Q1 - Control and Narrative

  • Summer Students - Additional analysis tools and UI improvements, better live data systems
  • Write a paper on the overall development and direction of the PhD, pretty much a whitepaper on the digital twin side of the platform.
  • Start looking into control strategies
  • Industry training day

2027 Q2 - Businessman

  • Start writing thesis
  • Add more control tools to the live systems
  • Get the live systems working in real-time on a site, updating code as required.

2027 Q3 - The Final Sprint

  • Main body of thesis, story done. Chapters on papers done.
  • Start job hunt for post-PhD
  • Continue working with sites to get the live systems working in real-time on a site.
  • Start negotiating contracts.

2027 Q4 - Wrapping up

  • Submit Thesis by November 30th 2027
  • Work on turning case studies into contract work for Ahuora
  • Find another job
  • Prep for the summer students and provide good documentation of everything that has been done.